What is it, and why use it?
A Process Monitoring Plan records what will be measured, who reviews it, how often and what response follows an unusual result.
It makes ongoing ownership explicit after a project team hands the work back to normal operations.
Explore the Process Monitoring Plan features and local-file workflowWhen to use it
Use it when a changed process needs regular review or when several measures lack a clear owner.
When another tool fits better
Use a Control Chart to examine time-ordered variation. Use a Control Plan for a wider record connecting process steps, controls and responses.
Before you start
- Reproducible metric definitions and reliable sources.
- Named review roles, practical frequency and an agreed escalation route.
- A baseline and a locally reviewed trigger.
Use fictional or approved non-sensitive information. Do not include patient details or proprietary records in practice worksheets.
Step-by-step in CI Tools
Enter Process and Plan owner, then add a monitoring item.
Complete Performance metric, Operational definition, Measurement unit and Data source. Include calculation and eligibility rules for rates.
Set Monitoring frequency, Responsible role, Target and Alert or trigger condition. Explain the Reporting method and Review frequency.
Record the Required response and review the plan with the people who will carry it out. Import selected Control Plan or CTQC records only after reviewing the copies.
Save the plan and arrange the actual review outside the application: this worksheet does not fetch live data or send alerts.
Targets, triggers and alerts are different
A target describes a desired result. A trigger tells a person when to investigate. An automated alert would require a live integration; this tool records the plan only and does not provide that integration.
Completed worked examples
Demonstrations only: all organizations, observations, targets and results below are fictional. They are not clinical instructions or universal performance standards.
Healthcare operations — fictional
Referral rework review
Starting information: A fictional office reviews intake rework weekly.
| Metric | Referrals needing missing information / eligible referrals × 100 |
|---|---|
| Review | Every Monday / intake coordinator |
| Trigger / response | Above locally agreed 20% → review ten cases and assign follow-up |
What the result means: This trigger schedules investigation; it is not a statistical control limit and does not automatically identify a cause.
General business — fictional
Order-date query monitoring
Starting information: A fictional service team reviews first useful response time.
| Source / unit | Query register / working hours |
|---|---|
| Review | Daily review by service lead |
| Response | Investigate any query older than the agreed eight-hour threshold |
What the result means: The lead must actually review the register. The saved plan is not an automated alerting service.
Practise in a separate worksheet
Open the tool’s built-in synthetic sample as a new editable worksheet. It may differ from the worked demonstrations above. It never replaces an existing worksheet. Save any work you want to retain to your computer.
Open built-in practice worksheetYou’ll be asked to log in if needed. No worksheet is created just by reading this page.
Common mistakes and how to avoid them
- Leaving the review role blank: monitoring needs an accountable reviewer.
- Using undefined traffic-light colors: write measurable trigger conditions.
- Expecting notifications: arrange the operational review outside CI Tools.
Interpret the result
Review whether each item has a definition, source, owner, frequency and usable response. The plan’s completeness does not establish process performance. Compare results with the defined population and period.
Record the assumptions and unanswered questions alongside the result. Use the relevant local review process before making operational decisions.
Credible further learning
These independent educational resources explain the methods. They do not endorse CI Tools Suite. Some external resources have their own access requirements.
- ASQ: Quality tools and templates (external resource)
- IHI: Quality Improvement Essentials Toolkit (external resource)
Resource links reviewed 29 October 2026. Our interface instructions and fictional examples are original CI Tools learning material.
Put the method into practice
Start a new worksheet, use the guide beside your work and keep an editable .citools copy on your computer.
Try This ToolChoose another tool